Estimating and Bidding

Reading Drawings Assignment
Planet Mazda

Instructions
⦁ This assignment is intended as a review for Reading Drawings.
⦁ If you need help with this assignment, be sure to check out the ⦁ Detailed Tutorial video.

Using the file “Planet Mazda Drawings for Reading Drawings Assignment”, answer the following questions:
⦁ expand the following abbreviations
⦁ AFF – _____________________
⦁ BM – _____________________
⦁ CJ – _____________________
⦁ CMU – _____________________
⦁ FOC – _____________________
⦁ RD – _____________________
⦁ GSN – _____________________
⦁ Construction drawings are filled with symbols, many of which are quite similar. Identify what the following symbols represent.

⦁ Based on the shading/design in the images, identify the key materials shown.

 

 

 

⦁ The building envelope passed the code inspection by what percent? ___________

⦁ Are these drawings SD, DD, or CD? ___________

⦁ What is the linear footage of 4” PVC Domestic Water Line required?

⦁ What is the Ordinance Number for the City of Las Vegas Fire Hydrant Requirements?

⦁ What is the total number of parking spaces required between the existing car dealership, the new car dealership, and the sales/inventory parking?

⦁ The restrooms shown at Gridlines E&5 on page A2.02 have a detail called out, where would you find that detail?

⦁ What is the scale on the Dimension Floor Plan?

⦁ There are six service bays at the North end of the building. How wide is each bay?

 

⦁ What is the total length of the North wall (From Oil Storage to the end of the Service Bays)

 

⦁ What is the height of the building at the tallest part?

 

⦁ What is the FFE?

 

⦁ On which side of the building are the four primary signs (Mazda, Drive Center, Planet, and Service)?

 

⦁ What material is the door to room 124?

 

⦁ Who is the manufacturer for the Insulated Service Door?

 

⦁ What is the frame required for Window Type D?

 

⦁ Which window type has a P-8 Finish?

 

⦁ Who is the Structural Engineer?

⦁ What is the live load requirement for the floor and stairs?

 

⦁ Footings are designed based on a net allowable soil pressure of ____________ PSF.

⦁ For a typical column base, what is the minimum concrete cover for structural steel below grade?

⦁ For the Joints in Slab on Grade, what is the maximum amount of time allowed to pass between placing the concrete and cutting a contraction joint?

 

⦁ There are 12 areas on the foundation plan which indicate a thicker foundation requirement. Identify where those are located and why the thicker slab is required.

 

⦁ What is the reinforcing requirement for CF6?

 

Explain the difference between the three types of line in this picture


    Customer Area

    Make your order right away

    Confidentiality and privacy guaranteed

    satisfaction guaranteed