You are employed by a local surveying company and have been approached by the local authority to carry out a topographic survey of a plot of land at the Future Skills Campus, Salford. The topographic survey is required for the initial and detailed design process. Part of the requirement is to set a control network of stations that can be used for future surveys and to aid in the setting out once construction commences.

You are required to produce a report on the plot for submission to the client including the following:

  • An explanation of the types of control networks that are available
  • A comparison of the accuracy of the network compared to national standards
  • An explanation of the process of conducting a topographic survey
  • A critical analysis of the accuracy achieved including the influence on the topographic survey

The client requires the network to be robust with a minimum of five stations.

Undertake the following:

  • Carry out a closed traverse of the station network which includes heights, internal angles and line

lengths.

Calculate from the survey the corrected eastings, northings and heights of each of the stations.


    Customer Area

    Make your order right away

    Confidentiality and privacy guaranteed

    satisfaction guaranteed